To plan electrical and plumbing work in a new build, agree on your room layouts and appliance requirements first, then ask qualified professionals to design the supplies, circuits, pipework and drainage together. Coordinate these designs with the structure before construction, get quotes for the agreed work, and schedule inspections and tests before anyone covers the installations.
When should you start planning building services?
Start while you can still change walls, floor levels and spaces for pipes and cables without rebuilding anything. Confirm furniture positions, kitchen cabinets, bathroom fittings and major appliances, because these determine where you need sockets, switches, water connections and waste outlets.
Give your designers a room-by-room brief rather than asking contractors to choose positions on site. Include equipment you expect to install later, but distinguish definite requirements from possibilities so you don't pay for unnecessary capacity.
- Mark beds, desks, televisions, kitchen worktops and fixed storage.
- List cooking appliances, washing machines, water heaters, pumps and air-conditioning equipment.
- Confirm bathroom fixtures, floor drains and outdoor water points.
- Identify internet equipment, security systems and any backup power requirements.
- Leave enough space to reach distribution boards, valves and tanks for maintenance.
Appoint an electrical designer and a plumbing designer, or suitably qualified contractors if your project allows contractors to design the installations. Confirm who will check the applicable building rules, utility requirements, approvals and inspection stages.
How to prepare your building services plans
Ask your utility providers early about the available electrical connection, water supply arrangement, sewer connection location and any connection restrictions. Supply pressure, drainage connection depth and available electrical capacity can affect your design, so confirm these rather than relying on assumptions.
Ask your designers to show electrical points and circuits, water and drainage routes, equipment locations and relevant installation heights on the drawings. Request a coordinated services drawing showing how pipes, conduits and ducts fit around beams, columns, ceilings and each other.
Record finished floor levels clearly. Give your contractors a shared reference for socket heights, shower outlets, drain connections and equipment clearances. Otherwise, they may produce inconsistent results by measuring from an unfinished slab.
Request itemised quotes based on the same drawings and specification. Ask contractors to list connection charges, equipment, wiring, pipes, fittings, labour, testing and repairs to disturbed surfaces separately. Check exclusions, agree on how you'll approve changes, and keep a contingency for genuine design changes. Don't expect a reliable fixed price from incomplete drawings.
How to plan your electrical installation
Place sockets where you'll use equipment, not simply at regular intervals along each wall. Check that doors, wardrobes and appliances won't block them, and position switches so you can reach them easily when entering a room.
Plan general lighting, task lighting and switching controls separately. Confirm ceiling fittings before you close up ceilings, including how you'll reach drivers, transformers and other components that may need replacement.
Ask your electrical designer to calculate demand and select cable sizes, circuit protection and the distribution board. High-load equipment may need dedicated circuits. Reserve board space and suitable routes for agreed future equipment rather than assuming spare breaker positions alone provide enough capacity.
Include earthing and fault protection in your design from the start. The Occupational Safety and Health Administration identifies grounding and protective devices among electrical safety measures. Ask your designer to select arrangements that meet the rules applicable to your building.
Ask specifically about residual-current protection, often called RCD or RCBO protection, which helps protect against certain earth-leakage faults. In bathrooms and other wet areas, make sure your designer specifies compliant equipment positions and suitable fittings. Never guess separation distances or which protective devices you need.
How to plan your plumbing layout
Group bathrooms, kitchens and utility spaces where practical to reduce pipe runs and simplify drainage. Check fixture positions against the structure, particularly for toilets and floor drains, as their drainage routes may not fit within a shallow floor build-up.
Ask your plumbing designer to size the supply pipes for expected simultaneous demand and available pressure. Confirm whether your building needs storage, pumping or pressure control, and provide safe access to any equipment that needs servicing.
Choose your hot-water system before finalising pipe routes. Long runs can increase your wait for hot water. Depending on your building, you may be able to reduce the wait by locating equipment closer to outlets or asking your designer to specify a suitable circulation system.
Ask your designer to specify drainage falls and venting. Drainage pipes need suitable gradients, while traps retain a water seal against drain gases and venting helps protect those seals. Include accessible cleaning points and confirm where your wastewater will discharge.
Specify isolation valves so you can shut off supplies for maintenance, and include backflow protection where required to protect your drinking-water supply. If you choose water-efficient fixtures, compare rated performance as well as consumption. You can find guidance on water-efficient products through the US Environmental Protection Agency's WaterSense programme.
How to schedule building services installation
Arrange a coordination meeting before foundations and slabs conceal service routes. Ask your builder, structural designer, electrician and plumber to agree on sleeves, openings, underground runs and who will install each part.
- Set out incoming services, below-ground drains and openings through foundations before the relevant concrete pours.
- Install first-fix pipes, conduits, boxes and supports while walls and ceilings remain open.
- Check positions against cabinets, sanitary fittings and finished surfaces.
- Complete required inspections and tests before plastering, screeding or closing ceilings.
- Fit visible accessories and fixtures after completing the appropriate finishes, then carry out final testing.
Don't cut structural members without your structural designer's approval. Agree on service crossings and supports rather than allowing each trade to improvise. Ask your designers to detail waterproofing around bathroom penetrations, and make sure your contractors restore the required fire stopping wherever services pass through fire-resisting construction.
What should you check before covering installations?
Make testing before concealment a required checkpoint in your construction schedule. Ask your plumber to test supply pipework and check drainage using the specified methods. Arrange for your electrician to inspect and test the installation at the appropriate stages under the applicable standard.
Before handover, check outlets, switches, fixtures, drainage flow, isolation valves and equipment operation. Obtain electrical test results, plumbing test records, required certificates, equipment instructions and warranty documents.
Ask your contractors to label circuits and valves, and provide photographs of concealed routes and as-built drawings showing what they installed. Keep these records together so you won't have to guess where cables and pipes run during future repairs.